Power shutdown
JAMMU, MARCH 04: Superintending Engineer (Distribution) JPDCL, O&M Circle Kathua has informed that to carry out the work of replacement of old/damaged 66 KV isolator at Receiving Station SICOP, the power supply to Industrial Area Hatlimorh, SICOP, SIDCO etc will remain affected on March 05 from 9.30 am to 4 pm.